Set in California’s Oakland Hills, the contractor is tasked with building a 2-story home above a walk-out basement.
The project was split into phases, with Premier’s pre-fabricated structural insulated panels (SIPs) arriving just in time for construction.
By coordinating with the contractor and SIP manufacturer, GBL was able to facilitate the right materials to arrive at the right times to accommodate the lack of construction access and staging area. GBL also worked with the shipping department so that the driver was prepared to handle the access challenges, enabling smooth project execution.